Step 1: Stake out Pool is staked out per engineered plans for your approval. |
|

|
|
Step 2: Excavation Bender board is attached to stakes and set at proper elevation. The pool is dug with a bobcat and hand carved to finish. |
|

|
|
|
Step 3: Steel Pool steel will be hand formed to fit pool for structural integrity. |
|

|
|
|
Step 4: Gunite Gunite trucks will set up on street. Hoses will be run back to pool for shooting gunite. |
|


|
|
|
Step 5: Plumbing Pool is now ready to set equipment and run plumbing. |
|

|
|
|
Step 6: Tile and Coping Installation of waterline tile and pool coping. |
|

|
|
|
Step 7: Waterfall |
|

|
|
|
Step 8: Decking Concrete trucks will set up on street and material will be carried by wheel barrow to pool. |
|


|
|
|
Step 9: Plaster Pool is now plastered with your choice of finish. |
|

|
|
|
Step 10: Filling Pool is now filled with water. |
|

|
|
|
Step 11: Clean-up Forms will be removed from decking and all construction debris removed. Area outside of decking will be leveled for your landscape to take place. |
|

|
|
|
Step 12: FUN! |
|

|